Beloyarskaya NPP

Beloyarskaya NPP

Electrical output: 1464MW

 

Beloyarskaya NPP is the NPP in Russia with power units of different types.

The NPP was constructed in two stages: the first stage – Power Units № 1 and № 2 with AMB reactors, second stage –Power unit № 3 with BN-600 reactor. After 17 and 22 years of operation the Power Units № 1 and № 2 were shutdown in 1981 and 1989 respectively. Nowadays they are under long preservation conditions with unloaded fuel and correspond, by international standards terminology, to the first stage of NPP decommissioning.

In 1957-58 Institute «Orgenergostroy» developed and realized the design of CAB, and the Main provisions on NPP construction were approved.

By construction of NPP the procedures of concrete works, of use of prefabricated elements, of large scale reinforcement form blocks, of application of heavy-weight concrete mixes and other complicated engineering decisions were developed.

The input of the Institute into improvement of adaptability to fabrication of precast – cast-in-place wall structures ensured year round construction process at the Plant.